|
MRP (Materials Requirement Planning),Internet,E-Pos,MS Excel,OHS Act,MS Projects,Windows,MS PowerPoint,MS Word,SAP,MS Outlook,Health and Safety Act,E-Mail
|
|
Engineering : SAP From 2022-03 To Current Duties MRC
Anglo Waterval Smelters
2007 Nov - 2007 Dec
DESCRIPTION
- Obtain the perfect Scope of Work from the Foreman, and assist in Site Meeting arrangement
- Create Reservations and follow up on Releases in the System
- Create Requisitions.
- Ensure that all quotations are relevant to the Purchasing Standard and Procedure
- Follow up on Releases of Requisitions and the Status when there’s a Purchase Order
available.
- Obtain Quotes for Spares, and if not on the system, apply for Codification
REASON FOR LEAVING
Contract ended because of motor accident
Plant Maintenance Administrator
Anglo Waterval Smelters
2008 May - 2009 Jul
DESCRIPTION
- Create Works Order from Notifications
- Scrutinize information of Job Cards that were returned and capture accurately.
- File all captured Works orders
- Monitor and Report on Artisan Utilization.
- Ensure Follow On Notifications were created.
- Follow up on all outstanding Works Orders
- Print Maintenance Schedules on a weekly basis
REASON FOR LEAVING
Contract ended because of recession.
Acting Planner FCE1 & 2; Metal Extraction & Recovery &
Dispatch
Glencore Wonderkop
[OFFICIAL]
2012 Oct - 2021 Jan
DESCRIPTION
Acting as Planner:
Period: 2012.10.01 – 2012.10.12 Period: 2012.12.03 – 2012.12.21
Period: 2013.06.24 – 2013.06.30 Period: 2013.07.01 – 2013.07.08
Period: 2014.12.09 – 2015.01.10 Period: 2015.03.30 – 2015.04.12
Period: 2016.12.12 – 13.01.2017 Period: 2018.01.29 – 2018.02.23
Period: 2018.03.12 – 2018.03.16 Period: 2018.04.26 – 2018.04.30
Period: 2018.05.01 – 2018.05.04 Period: 2018.12.24 – 2019.01.04
Period: 2019.09.23 – 2019.10.13 Period: 2021.01.20 – 2021.01.28
Duties:
- Obtain Quotations that complied to P2P Procedure
- Create Reservations
- Create Requisitions
- Follow up on all reservations, requisitions, Purchase Orders and open Commitments
against the Foreman’s Budget.
- Arrange Site Meetings with a Propper Scope of Work
- Assist with Shut Down Preparation
- Assist with Tracking of Shut Downs
- Assist with Quality Control during Shuts. Taking Photos and measurements and
reporting on all deviations.
- Assist with Infra-Red Scanning on Furnaces to check for hot spots.
- Keep track and daily reporting of Foreman’s Running Cost Budget
- Keep track of Capital Expenditures on Project Capital Costs
[OFFICIAL]
- Ensuring that all Legal Inspections in the Plant is done and up to date. (Pressure
Vessel testing, Lifting Equipment Load testing etc.)
- Codification of spare parts
- Applying for Stock Items in the Stores
- Applying for SAP Access for all Artisans, Foreman etc
- Applying for all Role Changes on SAP
REASON FOR LEAVING
Better Opportunities
Plant Maintenance Administrator
Glencore Wonderkop
2009 Aug - 2022 Mar
DESCRIPTION
- Create Works Order from Notifications
- Scrutinize information of Job Cards that were returned and capture accurately.
- File all captured Works orders
- Monitor and Report on Artisan Utilization.
- Ensure Follow On Notifications were created.
- Follow up on all outstanding Works Orders
- Print Maintenance Schedules on a weekly basis
- Do Thickness Testing Report on the Slimes dam, and send out report on a daily basis.
- Do Bump test and Data Downloads on All CO Monitors and Multigas meters
- Ensure that all Bi-Annual Calibration Tests are done on all CO monitors, Multigas Meters, Lux
Monitors, Confined Space Entry Kits & Infra Red Scanners
- Ensure all above mentioned equipment are available at all times, records of acceptance are
kept and filed.
[OFFICIAL]
- Ensure all forms for Obnoxious gasses on the system is relevant and used as per procedure
with each time the monitor are used.
- Ensure all Self-Contained Breathing Apparatus sets & Parrat Systems at the Furnace & Bag
Plant area are sealed and still before expiry date.
- Insure all information of Trackless Mobile Machinery that came on to the plant are listed, with
their permit number, license expiry date etc.
- Keep record of all Mobile Cranes and their inspections
- Ensure the calibration of Alcohol testers on the plant.
- ESKOM Meeting Minutes
REASON FOR LEAVING
Better Opportunities & to Further my Studies
Acting Planner for Planner Group U60
Anglo Mortimer Smelters
2024 Jan - 2024 Jan
DESCRIPTION
Duties:
- Create Reservations
- Create Requisitions
- Follow up on all reservations, requisitions, Purchase Orders and open Commitments against
the Foreman’s Budget.
- Codification of spare parts
- Creation of Work Packages using Anglo Standards, OHSA, Previous JRA’s and OEM Manuals
- Updating of Equipment BOM’s on SAP
- Sending of equipment for Strip and Quote and following up.
- Condition Monitoring Feedback
- Assist with Root Cause Failure Analysis
[OFFICIAL]
REASON FOR LEAVING
I'm still here. Part of Practical experience for Pragma Planning Diploma
Engineering Scheduler
Anglo Mortimer Smelters
2022 Mar - Present
DESCRIPTION
- Do Daily Scheduling
- Do Weekly Draft Schedules and Final Schedules
- Hold Meetings and Present Schedules to Applicable parties / Teams
- Use and Update Plant Routine Operating Schedule so that all Maintenance Work are done in
accordance.
- Do Shut Bar Charts
- Update Shut Bar Charts during the Shut
- Do Post Mortem on Shut
- Manage Backlog
- Keeping track of Missed Services
- Ensure Legal Compliance with all Maintainable Equipment Services (Presure Test's, Load
Tests, etc)
- Assist with updating of Maintenance Plans
- Assist in minimizing capital commitments on the budget
|